The last lot of the 2011 deal: Boeing gets $2.82 billion for 15 more KC-46 tankers, but the next 75 only once it fixes the flaws

The Pentagon announced a $2.82 billion Boeing contract for 15 more KC-46A Pegasus tankers, the final production lot under the programme's original 2011 contract, Defense News reports. The deal is about $350 million above the previous 15-tanker lot, bought for $2.47 billion a year ago. The earlier lot is due to be complete by mid-2029 and the new one by mid-2030.
The US Air Force has received 116 KC-46As so far, and 203 are on contract or in service worldwide, according to Boeing; Japan and Israel also fly the tanker. It is the last of 13 production lots priced into the original contract, Boeing's SEC filings show.
A condition for the next 75
The Air Force plans to buy up to 75 more through the Tanker Production Extension programme and wants 263 KC-46As in total to fully replace KC-135s built in the 1950s and early 1960s. Vice Chief of Staff Gen. John Lamontagne said, according to Reuters, that there will be no new contract for 75 jets "until we work through some of those deficiencies." The best-known KC-46A issues involve the refuelling boom and the Remote Vision System cameras operators use to guide it.
Sources and references
- I.Defense NewsUS Air Force buys final KC-46 lot under Boeing's original tanker deal🔗 https://www.defensenews.com/industry/techwatch/2026/11/25/us-air-force-buys-final-kc-46-lot-under-boeings-original-tanker-deal/
Keep reading
Selected long reads to continue with.
LONG READHormuz, the Red Sea and the Baltic: how freedom of navigation became a spoil of war, and why oil is still getting cheaper
LONG READEurope's war reindustrialisation: how the continent is returning to arms factories and where the shift is heading
LONG READAfter Shenzhen: what Trump, Xi and Putin achieved at the round table, and what stayed behind closed doors
LONG READ
Comments 0
No comments yet.